Illustrative educational example only. This is not a completed Taplin Systems project or customer case study. Verify dimensions, site conditions, product specifications, current quotes, and local requirements before using a result.
Scenario: An illustrative residential bathroom remodel organized into trade scopes. No project dimensions, labor rates, or market prices are assumed.
Published
Last updated
01
Define the scope before assigning costs
Write down what is being removed, retained, relocated, or installed. Confirm the room dimensions, existing conditions, access, finish selections, and any unresolved decisions. Separate included work from allowances and exclusions so an incomplete selection is not mistaken for a firm price.
- Protection, demolition, hauling, and disposal
- Framing, backing, drywall, and substrate preparation
- Plumbing rough-in, fixtures, and testing
- Electrical scope, lighting, ventilation, and testing
- Waterproofing, tile, grout, and related finish work
- Cabinetry, countertop, accessories, paint, and cleanup
02
Build a trade-by-trade cost plan
For each line, enter a measured quantity and a relevant unit—such as hours, square feet, linear feet, or pieces. Add labor, material, subcontractor, equipment, delivery, permit, and disposal costs only where they apply. Use current supplier and subcontractor quotes instead of generic prices.
Check that trade scopes do not overlap. For example, clarify who supplies fixtures, who performs patching, whether tile preparation is included, and whether demolition includes hauling. Keep allowances, contingency, and company overhead visible rather than hiding them in an unexplained total.
03
Review the total and margin
Once the scope and verified costs are complete, use the Estimator Builder to review the estimate and print a customer-facing summary. To calculate a target gross margin, use selling price = complete cost basis ÷ (1 − target margin as a decimal). Include overhead consistently in the cost basis or in a clearly defined pricing method, but do not count it twice.
This example intentionally does not show a project total: there are no dimensions, selections, or local pricing inputs from which to calculate one.
- Confirm applicable permits, inspections, and local requirements.
- Verify quantities and finish selections before ordering.
- State assumptions, exclusions, quote validity, and the process for approving scope changes.