Back to calculator directory

Business planning / contractor calculators

Break-Even Revenue Calculator

Estimate annual and monthly revenue needed to cover fixed costs at the selected variable-cost rate.

01 / Inputs

Use your business numbers

Example values are loaded. Replace them with your own figures. Every field is required; enter 0 where it applies.

02 / Result

Your working numbers

Annual break-even revenue

$200,000.00

Monthly break-even revenue
$16,666.67
Contribution margin
60.00%
Annual fixed costs
$120,000.00

How the math works

Annual break-even revenue = annual fixed costs / (1 - variable cost % / 100). Monthly break-even = annual break-even / 12. Contribution margin = 100% - variable cost %.

A variable-cost rate of 100% or more leaves no positive contribution margin, so break-even revenue is undefined and rejected. This simplified estimate assumes fixed costs and variable-cost rate remain constant.

Planning estimate only, calculated locally in your browser. Verify figures with your accountant, lender, and actual records before making financial decisions.

Contractor field notes

Find the revenue needed to cover contractor business costs

Break-even revenue is the point where revenue covers fixed expenses and the variable costs associated with that revenue, without leaving profit. Use it to understand the minimum sales level your current cost structure requires.

Contribution-margin break-even formula

Contribution margin = 1 − variable cost percentage ÷ 100. Annual break-even revenue = annual fixed costs ÷ contribution margin. Monthly break-even revenue = annual break-even revenue ÷ 12.

Worked example

If annual fixed costs are $180,000 and variable costs consume 60% of revenue, the contribution margin is 40%. Annual break-even revenue is $180,000 ÷ 0.40 = $450,000, or $37,500 per month. At that revenue, variable costs are $270,000 and fixed costs are $180,000, leaving $0 profit.

Common estimating pitfalls

  • A variable-cost rate of 100% or more cannot cover positive fixed costs.
  • Break-even is not a profit target or a guarantee that cash arrives on time.

Frequently asked questions

What is a fixed cost versus a variable cost?

Fixed costs are budgeted expenses that do not change directly with sales in this model. Variable costs are represented as a share of revenue. Classify each expense once to avoid double counting.

Does break-even include owner pay?

Only if you include owner compensation in the fixed-cost budget. The calculator does not add it automatically.

What if my projects have different margins?

Use a realistic weighted variable-cost percentage for your expected work mix, and test less favorable assumptions as well.