Contractor field notesHow This Calculator WorksFormula, worked example, assumptions, common pitfalls, and FAQs
Plan fencing by run, gate, and actual product dimensions
A fence is not always one uninterrupted line. This calculator divides every run at the entered gate locations, spaces intermediate posts within each segment, and deducts explicitly shared run corners. Board, rail, and panel quantities are rounded up after waste. Concrete uses the entered hole dimensions and manufacturer bag yield.
Who this calculator is for
Fence contractors and estimators planning straight runs with gates, posts, rails, boards, panels, and optional installation costs.
How to use this calculator
- Enter each fence run and the actual post spacing, board or panel dimensions, and number of rails.
- Add gate locations along each run so the calculator can split the fence and account for gate openings and posts.
- Review the post, infill, rail, and concrete quantities; enter optional costs and waste allowances when pricing the work.
Fence takeoff and margin formulas
Sections per uninterrupted segment = ceiling(segment length ÷ post spacing). Posts include run ends, gate posts, and intermediate posts, less shared run corners. Concrete = posts × π × (hole diameter ÷ 2)² × hole depth. Selling price = direct cost ÷ (1 − target margin).
Worked example
An 80 ft run with no gates and 8 ft post spacing has 10 sections and 11 posts. Two rails per section need 20 rails before waste. With 10% waste, order 22 rails. Eleven 12-inch-diameter holes at 2 ft deep contain 17.28 cu ft. At 0.6 cu ft per bag, allow 29 bags. A $3,000 total cost at a 25% margin requires a $4,000 selling price.
Assumptions and common pitfalls
- Use actual board face width, not nominal width.
- Enter gate locations in ascending order; gates must fit within the run without overlapping. Gates can meet run endpoints.
- Rail and board quantities are allowances, not an optimized cut plan or structural design.
Limitations
- The quantity model does not design post foundations, wind resistance, bracing, corner construction, or code compliance.
- Verify exact run geometry, product dimensions, gate hardware, manufacturer coverage, and site conditions before ordering.
Frequently asked questions
How does the fence calculator account for gates?
Each entered gate location splits the fence into separate sections and adds gate posts. Gate width is removed from infill length. The gate unit price is charged for every entered gate.
Can I override the post count?
Yes. A positive manual post count replaces the automatic count. A zero value retains the calculated count. Confirm all ends, corners, bracing, and gate posts against the site layout.
Does concrete bag weight determine yield?
No. The bag weight is recorded, but the entered manufacturer volume yield determines the number of bags. Different mixes may yield different volumes for the same weight.
